Myagdi, Aug 3 : People's mobility has been obstructed after a flood occurred at Malika Rural Municipality-7, Marangkhola in Myagdi on Monday swept away a wooden bridge.
The flood took away the bridge over
the Marang rivulet flowing through Shivaratri and Bharwang settlements.
It may be noted that the wooden
bridge that was installed after the flood that occurred on 9-10 July 2020 had blown
away the bridge constructed over the rivulet with the use of Truss
technology.
Chairperson of Janmabhumi Youth
Club of Bharwang Prabin Jumjali shared that people's mobility has been
completely halted after the flood took away the temporary wooden bridge.
"Problem has emerged when
Bharwang village remained out of connectivity through road and trail
route", he said, adding even school students are being deprived of
attending classes.