Tanahun, June 29 : The obstructed Prithivi Highway has resumed following the removal of landslide debris near Aina Pahara at Aanbukhaireni-2 in the Tanahun district. A dozer was deployed to clear the landslide deposition, said the Area Police Office, Aanbukhaireni.
The road was obstructed by the landslip at the
area, resulting in scores of vehicles heading to their destinations getting
stuck midway, said the police. The road leading to Gorkha through Muglin and
Aanbukhaireni reopened after clearing the road.
But, the obstructed road leading to
Pokhara has yet to resume as the removal of debris is underway, said the Deputy
Superintendent of Police. "The obstructed road too will reopen
soon." (RSS)