Breakthrough made in entry of supply tunnel of Tanahu hydel project

blog

By Amar Raj Naharki, Tanahu, Feb 2: A breakthrough has been made in the entry tunnel of the 140-MW Tanahu Hydropower Project being construction at Jhyaputar in Rishing Rural Municipality-1.

With the success in clearing the opening of the entry point to the tunnel, the 436 long tunnel with 7 meter width has been constructed, according to Rajabhai Shilpakar, acting chief of the project.

The tunnel will enhance supply of construction materials through it to the dam site of the project where 140-meter high dam will be constructed.

How did you feel after reading this news?