By Amar Raj Naharki, Tanahu, Feb 2: A breakthrough has been made
in the entry tunnel of the 140-MW Tanahu Hydropower Project being construction
at Jhyaputar in Rishing Rural Municipality-1.
With the success in clearing the opening
of the entry point to the tunnel, the 436 long tunnel with 7 meter width has
been constructed, according to Rajabhai Shilpakar, acting chief of the project.
The tunnel will enhance supply of construction
materials through it to the dam site of the project where 140-meter high dam
will be constructed.