Sindhupalchok, Aug 6: Helambu-Melamchi and Panthpokhari
roads have been obstructed by flooding and a landslide caused by continuous
rain.
Flooding at Gyalthum, Chanaute,
Talamarang and Simkhet has blocked the Helambu-Melamchi road disrupting
transportation. As a result, vehicles heading to Kathmandu have been
stuck.
Similarly, flooding swept away two
excavators parked along the road at Melamchi-11 and damaged the Melamchi
drinking water project, said, local people.
Likewise, a landslip obstructed the
Bhotechaur-Kaule road and the road at Tipeni of Panchpokhari Thangpal Rural
Municipality-8.
Nineteen houses in the bazaar area
are at risk of being washed away, said Panchpokhari Thangpal Rural Municipality
chair Tasi Lama. The activities to remove landslide debris are underway, he
said. Five houses, a school and a road at Helambu-5 are at high risk.
Details of the loss caused by flooding have yet to be collected, said Helambu Rural Municipality chair Nima Gyaljen Sherpa. (RSS)