By TRN Online,
Kathmandu, Feb 13: The supply pipeline of the drinking water that was damaged yesterday
has been repaired.
The pipe burst due to horizontal drilling by the Nepal Electricity Authority (NEA) for
laying underground electricity lines.
Ashok Kumar
Paudel, executive director of the Kathmandu Upatyaka Khanepani Limited (KUKL)
shared that the repairing of the pipe has been completed within 20 hours from
the instruction of the Drinking Water Minister Pradip Yadav.
Distribution
of drinking water in the area will resume after trial of the repaired pipe.